Guidance
These notes are for guidance only. Further details are available from Milton Keynes Building Control and The Building (Local Authority Charges) Regulations 2010.
All Building Regulation applications, except Regularisation’s and Reversions, are subject to VAT at the current rate. The charges shown here are inclusive of VAT.
Individual quotations will be given to all Reversion applications, and all works not included as standard charges.
A ‘full plans’ submission will include an ‘architectural’ type drawing containing a full building specification and generally the charge is paid in two parts. A plan charge is deposited with the paperwork and a further inspection charge will be invoiced to the applicant after the first inspection of the work on site. The drawings will be approved when they show compliance with the requirements of the Building Regulations.
The charges assume that the work does not involve innovative or high-risk construction techniques and that the duration of the work does not exceed 24 months. Any variation to this will require a separate quotation.
The charges assume that the design and building work is undertaken by a person or company that is competent to carry out the work. If they are subsequently found to not be competent then the owner may incur an additional charge.
If external consultants are required to be used by Milton Keynes City Council, then their costs may be passed on to the person having the works undertaken.
Charges are not payable for:
- Where a plan has been rejected for the resubmission of the scheme provided the scheme is substantially the same as before.
- Informal advice and consultations on meeting the Building Regulations up to one hour.
- Where work is solely for a disabled person in line with The Building (Local Authority Charges) Regulations 2010.
Estimated cost of work:
This means an estimate, accepted by Milton Keynes Council, of such reasonable amount as would be charged for carrying out that work by a person in business to carry out such work. Therefore, no reduction is permitted for DIY work. Estimates should exclude VAT, land acquisition costs, and professional fees paid to architects, engineers, or surveyors.
Completion Certificates:
A completion certificate will be issued upon satisfactory completion of the work. Where an inspection is requested against an application where more than three years have elapsed since the previous inspection, an additional charge of £190.00 (plus VAT) will be payable.
Individually determined charges:
The following projects will require an individually determined charge:
- a change of use of the whole, or part, of a building, Basements, Reversion applications, Regularisation applications not identified in the charge’s tables.
TABLE A: STANDARD CHARGES FOR THE CREATION OR CONVERSION TO NEW DWELLING (£) | |||
No | Full Plans | Building Notice Charge | |
Plan Charge | Inspection Charge | ||
1 | 312 | 813.60 | 1238.40 |
The charge for dwelling with total floor area up to 300m2 includes an attached or detached single storey garage up to 30m² floor area. For more than one dwelling and dwellings over 300m2 the charges are individually determined.
TABLE B: DOMESTIC EXTENSIONS TO SINGLE BUILDINGS (£) | ||||
Category of work | Full Plans | Building Notice Charge | Regularisation charge (does not incur VAT) | |
Plan Charge | Inspection Charge | |||
Extension floor area up to 10m2 | 312 | 252 | 620.40 | 705 |
Extension floor area exceeding 10m2 but not exceeding 40m2 | 312 | 399.60 | 782.40 | 890 |
Extension floor area exceeding 40m2 but not exceeding 60m2 | 312 | 750 | 1168.80 | 1328 |
Extension floor area exceeding 60m2 but not exceeding 100m2 | 312 | 813.60 | 1238.40 | 1407 |
Loft conversion that does not include the construction of a dormer | 312 | 499.20 | 892.80 | 1014 |
Loft conversion that includes the construction of a dormer | 312 | 750 | 1170 | 1328 |
Erection or extension of a non-exempt attached or detached domestic garage or carport up to 40m2 | 312 | 126 | 482.40 | 548 |
Erection or extension of a non-exempt attached or detached domestic garage or carport exceeding 40m2 but not exceeding 60m2 | 312 | 240 | 607.20 | 690 |
Conversion of a garage to a dwelling to a habitable room(s) | 312 | 156 | 516 | 585 |
Where the work is not covered in one of the tables the charge will be individually determined.
TABLE C: DOMESTIC ALTERATIONS TO SINGLE BUILDINGS (£) | ||||||
Category of Work | Basis of Charge | Full Plans | Building Notice Charge | Reduction* | Regularisation charge | |
Plan Charge | Inspection Charge | |||||
Renovation of a thermal element to a single dwelling. | Fixed price per element. | 312 | Nil |
312
|
N/A | 390 |
Internal alterations, installation of fittings (not electrical) and/or, structural alterations. If ancillary to the building of an extension no additional charge, Fixed price based on estimated cost bands. | Estimated cost less than £5,000. | 312 | Nil | 343.20 | N/A | 390 |
Estimated cost exceeding £5,000 up to £25,000. | 312 | 374.40 | 756 | 25% | 858 | |
Estimated cost exceeding £25,001 and up to £50,000. | 312 | 625.20 | 1030.80 | 25% | 1712 | |
Window replacement (non-competent persons scheme). Fixed price grouped by numbers of windows, | Per installation up to 20 windows. | 312 | Nil | 312 | 25% | 390 |
Per installation over 20 Windows. | 312 | 124.80 | 480 | 25% | 546 | |
Electrical work (not competent persons scheme). Fixed price based on estimated cost | Estimated Cost up to £10,000. | 456 | Nil | 504 | N/A | 570 |
*Details of any reduction for work carried out at the same time as work referred to in Table B
Table E – All OTHER NON-DOMESTIC WORK – ALTERATIONS (£) | ||||
Category of work | Basis of charge | Full Plans | Regularisation Charge | |
Plan Charge | Inspection Charge | |||
Window and Shop Front(s).Replacement (non-competent person’s scheme). | Per installation up to 50 windows | 438 | Nil | 600 |
Renovation of a thermal element | Estimated cost up to £50,000 | 438 | Nil | 600 |
Other alterations not described elsewhere including structural alterations and installation of controlled fittings | Estimated cost up to £5,000 | 438 | Nil | 600 |
Estimated cost exceeding £5,000 and up to £25,000 | 438 | 499.20 | Individually determined | |
Estimated cost exceeding £25,000 and up to £50,000 | 438 | 750 | Individually determined | |
Estimated cost exceeding £50,000 and up to £100,000 | 438 | 1062 | Individually determined | |
Installation of Mezzanine floor used solely for Fixed price 365 260 individually determined 17 storage purposes up to 300m2 | Fixed price | 438 | 312 | Individually determined |